Megawatt ScaleOut Facility Solutions

Having a couple or a dozen ASICs in your possession is a piece of cake, compared to operating a hundred (or even a few hundreds) of them. The more miners – the more responsibility, especially when your yearly ambient temperatures are above average. DCX offers a reliable and easily scalable solution that would allow you to immerse your machines in a high-quality dielectric fluid, launch forget about them for a longer period of time. Not only may rack groups be installed in a storage facility, but they can also be put in an ISO container, which is a great choice if you intend to invest in a mobile containerized mining farm. Furthermore, all generated heat can be reused for various purposes, ranging from heating residential premises to supplying greenhouses with required level of heat.

1
Immersion Mining Enclosure – active immersion system with integrated hydraulic fittings, heat exchanger and circulation pump.
2
Front mounting frame – used to lift and manipulate the enclosure in the rack, and also to mount any external component like PDU, switchgear box od PSU
3
Switchgear box – optional component may be mounted on the front of enclosure. Contains overcurrent protection, circuit breaker, cable fittings, terminal blocks, cabling. We use top class Schneider, Eaton, Legrand or Siemens components.
4
Main compartment of the Immersion Mining Enclosure – fits 8x S19 / S17 miners or 12 or even 13x Whatsminers. May be configured flexibly for mixed miner configuration.
5
Mounting points for zip ties to secure miner cabling.

Overview

Crypto mining industry brings significant challenges: heat, equipment failures, power usage, a limited possibility for overclocking, low reliability, loud noise, enormous amount of heat that requires a specific location with low ambient temperature, space, and immense masses of air pushed through cooling systems. All that being said, such factors as dust, vibration and humidity degrade MTBF, which is already low.

Small but dense Immersion Crypto Mining Containers are a great choice if you’re looking for an effective solution from a trustworthy manufacturer. Operating a cryptomining farm can only mean two things: either winning big, or losing big. Thus, creating custom DIY immersion cooling tanks or buying from an untrusted seller has high/unacceptable risk of failure. Why invennting a wheel when you can buy a Ferrari? DCX Immersion Mining Unit solves all issues with proprietary, patent-pending granular Immersion Enclosure fluid distribution.  The unmatched density of over 600 ASIC miners installed in immersion enclosures results in 1 to 2 MW power density. Central filling and draining of 20ft High Cube Container allow us to transport the system to a convenient location with low power cost and convenient legal framework safely. Each of our Immersion Containers is equipped with its own second loop pumping station and a heat exchanger. DCX’s second loop fluid distribution system circulates our ThermaSafe R™ dielectric Heat Transfer Fluid. Single-phase liquid has 1600x better heat capacity and 4.5x better heat conductivity than air. Our fluid ejects 100% of heat outside the enclosure and protects devices from harsh environment and failure mechanisms including high temperature, humidity, vibration, corrosion, dust – all the major causes of electronic failures. It also reduces thermal expansion cycling, maintains stable temperature, eliminates airborne contaminants, and failures caused by zinc and tin whisker growth. ThermaSafe R™ also serves as a fire suppressant, making remote mining operations possible.

FEATURES

  • 70% higher heat transfer performance than any other solution
  • Hosts new M56 / M50 and overclocked S19  miners.
  • 30-40 x M56 miners per Immersion Rack
  • 4MW and 720 miners – most powerful and affordable Immersion Mining Containers
Get the SpecsheetRequest Quote

GET IN TOUCH

You have a plan or question about liquid cooling project? We have answers. Reach out to our experts directly and get a professional & custom-sized immersion or hydro cooling technical project – at no charge. Let’s Make Things Happen!

WE SHIP & INSTALL WORLDWIDE

1 MW FACILITY : 360x Whatsminer M3x/M5x or 240x Bitmain S19 models

1 MW installation: 1 rack group with a 1 MW Immersion Optimized Dry cooler and a pumping station.

A complete, modular and flexible immersion system designed for 35C/110F temperatures and future extension in terms of power capacity. Complemented with a 1MW Immersion Optimized Dry Cooler. Space-saving rack design with system-piping and simplified topology. All components are designed to fit standard ISO containers for convenient and affordable transportation. That results in easy to maintain, extremely dense enterprise-class cryptomining facility.

  • 10 Immersion Racks combined into a rack group and connected to a DCX 1MW IOD.
  • 1x 10 Immersion Rack group with a technical corridor.
  • 3 level rack system with 30 Universal Immersion Mining Enclosures for current and future miner models.
  • Primary and Secondary Loop Fluid Distribution System based on prefabricated and pre-sized components.
  • 30x220L of dielectric Heat Transfer Fluid = 6600L
  • Immersion Optimized Dry Cooler 1MW capacity

2 MW FACILITY: 720x Whatsminer M3x/M5x or 480x Bitmain S19 models

2 MW installation: 1 rack group with a 2 MW Immersion Optimized Dry cooler and a potent pumping station.

A complete, modular and flexible immersion system designed for 35C/110F temperatures and future extension in terms of power capacity. Complemented with a 2MW Immersion Optimized Dry Cooler. Space-saving rack design with system-piping and simplified topology. All components are designed to fit standard ISO containers for convenient and affordable transportation. That results in easy to maintain, extremely dense enterprise-class cryptomining facility.

  • 20 Immersion Racks ccombined into a rack group and connected to a DCX 2000EC IOD.
  • 1x 20 Immersion Rack group with a technical corridor.
  • 3 level rack system with 60 Universal Immersion Mining Enclosures for current and future miner models.
  • Primary and Secondary Loop Fluid Distribution System based on prefabricated and pre-sized components.
  • 600x220L of dielectric Heat Transfer Fluid = 13200L
  • Immersion Optimized Dry Cooler 2MW capacity

6 MW FACILITY : 2160x Whatsminer M3x/M5x or 1440x Bitmain S19 models

6 MW installation: 3 rack groups with 3 x 2 MW Immersion Optimized Dry coolers and individual pumping groups / primary loops.

A complete, modular and flexible immersion system designed for 35C/110F temperatures and future extension in terms of power capacity. Complemented with 3x 2MW Immersion Optimized Dry Coolers. Space-saving rack design with system-piping and simplified topology. All components are designed to fit standard ISO containers for convenient and affordable transportation. That results in easy to maintain, extremely dense enterprise-class cryptomining facility.

  • 60 Immersion Racks divided into 3 rack groups (2 MW each) connected to 3 individual DCX 2000EC IOD (6MW).
  • 3x 20 Immersion Rack groups with technical corridors.
  • 3 level rack system with 180 Universal Immersion Mining Enclosures for current and future miner models.
  • Primary and Secondary Loop Fluid Distribution System based on prefabricated and pre-sized components.
  • 180x220L of dielectric Heat Transfer Fluid = 39600L
  • 3x Immersion Optimized Dry Coolers 2MW capacity = 6MW total

Quick intro

Unboxing of the Immersion Enclosure package and quick intro to the system components.

What you get – bundle

Enclosure with a 40kW dry cooler. We have a new ICP40 now, but you see what you get in the bundle package.

Installation & Startup

You bought the package – now what? Quick installation guide for effective commissioning of this smart immersion cooling system.

OVERVIEW

Crypto mining industry brings significant challenges: heat, equipment failures, power usage, a limited possibility for overclocking, low reliability, loud noise, enormous amount of heat that requires a specific location with low ambient temperature, space, and immense masses of air pushed through cooling systems. All that being said, such factors as dust, vibration and humidity degrade MTBF, which is already low.

Small but dense Immersion Crypto Mining Containers are a great choice if you’re looking for an effective solution from a trustworthy manufacturer. Operating a cryptomining farm can only mean two things: either winning big, or losing big. Thus, creating custom DIY immersion cooling tanks or buying from an untrusted seller has high/unacceptable risk of failure. Why invennting a wheel when you can buy a Ferrari? DCX Immersion Mining Unit solves all issues with proprietary, patent-pending granular Immersion Enclosure fluid distribution.  The unmatched density of over 600 ASIC miners installed in immersion enclosures results in 1 to 2 MW power density. Central filling and draining of 20ft High Cube Container allow us to transport the system to a convenient location with low power cost and convenient legal framework safely. Each of our Immersion Containers is equipped with its own second loop pumping station and a heat exchanger. DCX’s second loop fluid distribution system circulates our ThermaSafe R™ dielectric Heat Transfer Fluid. Single-phase liquid has 1600x better heat capacity and 4.5x better heat conductivity than air. Our fluid ejects 100% of heat outside the enclosure and protects devices from harsh environment and failure mechanisms including high temperature, humidity, vibration, corrosion, dust – all the major causes of electronic failures. It also reduces thermal expansion cycling, maintains stable temperature, eliminates airborne contaminants, and failures caused by zinc and tin whisker growth. ThermaSafe R™ also serves as a fire suppressant, making remote mining operations possible.

FEATURES

  • 70% higher heat transfer performance than any other solution
  • Hosts new M56 / M50 and overclocked S19  miners.
  • 30-40 x M56 miners per Immersion Rack
  • 4MW and 720 miners – most powerful and affordable Immersion Mining Containers

Get in Touch & Get the Quote

We’d love to help you in your project with our liquid cooling systems.

We need more info:

We need basic information required to size the DCX Immersion Mining system correctly:

  • type and number of ASIC miners or GPUs
  • expected miners power
  • your plan for heat rejection – we can deliver immersion optimized
  • dry cooler or connection to local water loop
  • city / country of your operation – to make sure w will deliver
  • expected performance in your maximum ambient temperature and to quote shipping cost.